How high to start first course of siding.
Spend the extra few bucks on the wider stuff and start your siding a bit lower.
This will be used as a template for the horizontal cuts.
Lock a small piece of scrap siding into the lower panel next to the window.
Nail the cut off shingle into place about 6 inches from its lower edge.
Preparing walls for lap siding.
Most suppliers sell two sizes of starter 2 1 2 in.
This is where the new siding will begin.
To provide a common reference point measure up 8 in.
This project is using an 8 wide siding with a 1 overlap resulting in a 7 reveal.
Begin by installing the first row of siding on both sides of the deck.
Once you ve decided where you want the siding to begin drive a nail through a point on your chosen starting height and snap a chalk line around the perimeter of the house.
Hammer in one nail about 2 inches from each end of each shingle and another nail about 1 inch above each cutout.
Nail a piece of plywood about 3 5 inches 89 mm thick along the top of the chalk line this will hold out the bottom of the first row of siding.
Generally a starter piece is installed underneath the first course to simulate the typical overlap and to orient the panel at the proper angle.
Vinyl siding starter strips snap a level chalk line for the first starter strip at the base of the wall no less than 8 inches above ground level after determining the lowest corner of the house.
Use a table saw to rip a 1 wide strip of the siding.
Add approximately 1 4 6 4mm to both sides to allow for expansion and contraction of the siding.
The walls should be stripped of all previous siding and the surface should be fairly smooth and flat because lap siding will follow along any contours.
Click here to learn some vinyl siding cleaning techniques that will make your house look new.
This chalk line should be level and a consistent distance from the eaves or the top and bottom of the windows.