Roll the roof paper up and over the peak.
How for put nail on the felt in roll roofing.
When compared to shingles rolled roofing is far cheaper and much easie.
Start the roof felt at one bottom corner of the roof.
Nail the roofing in place with short roofing nails spaced 6 inches apart and 1 inch in from the outer edges of the roll roofing.
An underlayment of felt roofing is optional.
They are long enough to penetrate the sheathing.
All nails and staples should be placed on the lower half of the paper.
If you have a sloped roof cut strips of roofing 9 inches wide position them flush with the drip edges along the eave and rake and attach them by driving two rows of nails that are about 3 inches apart.
Step 3 nail down the 18 inch roll roofing sheet that it is covering the valley.
Step 5 secure ends.
Apply rolled roofing rolled roofing has become more and more popular in recent years.
Use a trowel to spread roofing cement over half or more of the strips.
Tack it in place at the corner with the end flush with the end of the roof and the bottom edge of the roll right along the bottom of the roof.
When unrolling the next adjacent roll allow for at least a two inch overlap.
Step 6 overlap next roll.
Repeat this until the entire roof is.
Place this roofing material so it straddles the valley.
The entire length of the valley should be covered with a sheet of roll roofing that is at least 18 inches wide.
Where a roll ends and a new one is begun the two rolls should be overlapped by four inches.
The nails should start 3 4 inch from the edges of the roofing and be 6 inches apart throughout the roofing s surface.
You will need 1 10 gallon of lap not mastic cement for every roll and 2 pounds of roofing nails for every square.
The overhang to the next strip should be 3 8 inch.
The paper should then be nailed in or stapled every three to four inches across.
In roofing one square equals 100 square feet.