Count your way down to benchmark where the starter strip will go.
How do you layout vinyl siding.
Vinyl siding comes in many shapes sizes and colors to help you design the perfect look for your project.
Vinyl siding installation on a dreamspaces shed.
Leave a minimum of 1 4 6 4mm clearance at all openings and stops.
Some manufacturers of vinyl siding do not recommend the use of drop in backers with certain vinyl siding configurations.
Vinyl siding can be installed over common wood sheathings such as plywood oriented strand board osb or other materials e g foam plastic insulating sheathing.
It protects the sheathing from rain snow and pests.
When installing in temperatures below 40 degrees f increase minimum clearance to 3 8 9 5mm.
It is one of the most versatile siding products on the market today.
Begin at the windows.
Allow approximately 1 32 0 8mm clearance about the thickness of a dime between the fastener head and the siding panel.
Keep in mind that most vinyl siding profiles are intended to emulate the look of traditional wood siding products.
Installing vinyl siding in these 23 steps step 1.
Siding that is aligned with the bottoms and tops of windows is faster to install and looks better.
The bottom of the starter strip the part the bottom panel hooks on to should be at least 1 in.
Below the top of the foundation but the lower the vinyl siding is installed the better.