It serves to protect the base sheet on your roof and keep it watertight.
Hot mopped evaloy fleeceback roof system.
This can assure compatibility with the underlying roof system in a re cover over a built up or modified bitumen system.
Hyload h150e is a hot applied elastomeric membrane manufactured in a process that blends coal tar pitch with dupont elvaloy kee and is reinforced with dispersed polyester fibers.
Tpo is a single ply roofing system that consisting of a thermoplastic polyolefin membrane.
The fleece backed membrane is fully mopped to an acceptable existing roofing membrane structural concrete deck base sheet or hp recovery board with type iii or iv asphalt or modified asphalt.
This unique formulation combines the time proven characteristics of coal tar pitch with the advanced technology of dupont elvaloy to provide a high performance roofing membrane.
After the roof system is selected the specifics of the system such as deck type insulation type s and thickness fastener patterns and warranty requirements are developed and details are designed.
This membrane is composed of three layers.
The fleece allows for application of the membrane in hot asphalt.
Can be used as a cap sheet in bur and sbs systems when adhered using hot asphalt.
Ensure plasticizer retention extend roof life exceeded 40 000 hours of accelerated weathering testing astm g 154 requires 5 000 hours and to.
The hot mop roof bur installation job can be completed within 2 to 4 days depending on the size of the roof and the number of installer we ve put on the job.
The fleece backed membrane is fully mopped to an acceptable existing roofing membrane structural concrete deck base sheet or hp recovery board with type iii or iv asphalt or modified asphalt.
A roof system should be selected that optimally responds to an integration of the project s requirements and the system selection criteria.
Amount of dupont elvaloy kee ketone ethylene ester polymer to.
Applying the hot mop in progress is the second step to a general re roofing process acting as a secondary barrier between dry materials and tiles.
The tpo membrane was first introduced to the roofing market in the early 1990 s as a more economical and efficient alternative that was thought to replace pvc roofing products.
The hot asphalt is laid out evenly with a large heated mop over the surface.
This is great news especially because the average tile roof will take anywhere between a week to up to 10 days to be completely installed.
Fleeceback afx multiple ply epdm tpo hot mopped cold applied adhered specification and details 3 part csi format 3 part csi format specification for carlisle s adhered multiple ply fleeceback afx epdm tpo hot mopped cold applied roofing systems.
Adjoining sheets of membrane are spliced.