A vent terminal and depending if the roof is strictly for weather protection it terminates about 24 above the roof.
Hight of vent pipe above roof park county colorado.
All open vent pipes that extend through a roof shall be terminated at least 6 inches 152 mm above the roof and not less than 2 inches 51 mm above the invert of the emergency overflow except that where a roof is to be used for any purpose other than weather protection the vent extensions shall be run at least 7 feet 2134 mm above the roof.
Park county residential inspection checklist inspection line.
The vent is supposed to be 10 away or 2 above any window.
The following is a list of the inspections in the general order that they occur and some of.
Horizontal vent pipes forming branch vents relief vents or loop vents shall be located not less than 6 inches 152 mm above the flood level rim of the highest.
The maximum length of a 4 inch 102 mm diameter exhaust vent shall not exceed 35 feet 7620 mm from the dryer location to wall or roof termination and shall terminate with a full opening exhaust hood.
A reduction in maximum length of 2 5 feet for each 45 degree bend and 5 feet for each 90 degree bend shall apply.
Open vent pipes that extend through a roof shall be terminated at least 6 inches 152 mm above the roof or 6 inches 152 mm above the anticipated snow accumulation whichever is greater except that where a roof is to be used for any purpose other than weather protection the vent extension shall be run at least 7 feet 2134 mm above the roof.
The 2018 international residential building plumbing mechanical fuel gas energy conservation existing building and property maintenance codes as amended by larimer county take effect for all permits initiated on or after february 1 2019.
That means that when there is mechanical equipment on the roof sun decks you name it the plumbing vents need to extend up above the roof 7 feet.
719 836 4257 please have permit ready.
A connection between a vent pipe and a vent stack or stack vent shall be made at not less than 6 inches 152 mm above the flood level rim of the highest fixture served by the vent.
If the roof area is for people then it is 7 ft above the roofing surface.
You must also consider the snow line so the pipe does not get covered.
Residential dwelling and residential accessory structure s building projectare required to be inspected at various stages of construction.
Permits initiated before february 1 will stay under 2015 code requirements.